4/17/2023 0 Comments Ardic diesel heater manual![]() Rig – cutter rigged, 10mm SS 316 stays used throughout The deck and cabin tops are finished with Carboline two-part white polyurethane (February/March 2016). ![]() Topsides are finished with Jotun Hardtop AS two-part polyurethane (Jade Mist Green). Anti-fouling is enhanced with Clean-a-Boat ultrasonic antifouling (four 50W transducers, consumes approximately 22Ahr/24 hours). The bottom was freshly painted in July 2016 with two coats of 3M EA9 two-part epoxy, then covered with six coats of AMC Coppercoat (first applied in September 2008, and then again in July 2016). Sandblasted to white metal and first painted in June 1995 with Devoe inorganic zinc primer, then Devoe Bar Rust 235 epoxy base. ![]() After a good pressure wash at Bock Marine.īuilder – Wade Alarie (during the period 1992-2002)ĭraft – 7 feet 2 inches (fresh water), 7 feet (salt water)
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |